About us

We work with you to solve your energy challenges through innovative solutions, delivering resilience, cost efficiency and sustainability

About us overview
Celebrating 30 years of flying high in the aviation sector
Celebrating 30 years of flying high in the aviation sector

Contracted since 1993, we have kept three major airports running smoothly 24/7, 365 days a year. For the past 30 years we have owned, operated and maintained critical infrastructure for Heathrow, Gatwick and Stansted.

Read more

Sustainability

Pioneering solar car port launched at Council HQ
Pioneering solar car port launched at Council HQ

Northumberland County Council is celebrating the launch of its new state-of-the-art solar car port array - one of the biggest of its kind in the UK.

Read more

Industries

Our clients include some of the highest profile public and private sector organisations with critical infrastructure in complex environments.

Our industries
Partnering with bp pulse on the opening of their most powerful EV charging hub in London
Partnering with bp pulse on the opening of their most powerful EV charging hub in London

We have partnered with bp pulse to install and project manage their new ultra-fast hub in Central London.

Read more

UK Power Networks Services deploy electric vehicles at London airports

UKPNS Deploy Electric Vehicles At London Airports

19 October 2018: We've introduced the first electric vehicles and charge points into our fleet at Heathrow, Gatwick and Stansted Airport depots, and EV charge points at our London City Airport depot.

UK Power Networks Services has introduced the first electric vehicles (EVs) and charge points into its fleet at Heathrow, Gatwick and Stansted Airport depots, and EV charge points at its London City Airport depot.

This follows the announcement that UK Power Networks is trialling eight electric Renault Kangoo vans in its operational fleet, to be powered by on-site solar generation at six locations, to improve air quality for future generations.

The energy solutions company, UK Power Networks Services, operates and maintains the electricity networks at London’s airports. Staff will use the EVs to carry out their work, which will improve air quality and reduce carbon emissions caused by ground transport in and around the airports.

Through the introduction of electric vehicles into the UK Power Networks Services fleet, the company will help the airports reduce their overall carbon emissions and support them in achieving their sustainability ambitions.

UK Power Networks Services are leading the EV trial for the group, collecting valuable data on the performance of the vehicles, identifying future opportunities to increase the number of EVs and gain a better understanding of the economic benefits.

UK Power Networks Services introduced EVs to its fleet following employee and client feedback. Russell Austin from the company’s Heathrow depot said:

"It’s important to start to use EVs around the airport to save money and reduce air pollution. As a substation inspector who drives around the airport, I’m proud to be able to say that I’m helping to reduce carbon emissions.”

Ian Smyth, Director of UK Power Networks Services, said:

Icon Quote
We are committed to supporting our clients’ sustainability ambitions and deploying electric vehicles to help us operate and maintain the airports’ electricity networks will contribute to the overall reduction of carbon emissions at each airport.

“Our clients expect us to lead the way with fleet electrification. This trial will give us valuable data to support the deployment of electric vehicles into fleets of any size.”

The company will also use the insight from the trial to help airports and other fleet operators build their EV strategy and business case to deploy electric vehicles into their fleets.

In a major technological advance, UK Power Networks Services also recently implemented a smart electric vehicle charging system to enable delivery firm UPS to increase the number of 7.5-tonne electric trucks operating from its London site from 65 to all 170. In what is believed to be the first time in the world on this scale, the solution prevented the need for an upgrade to the power supply connection to the grid.

All insights and news